26 August – D-5

On Monday, the PAC was transferred onto the PFRCS in S3B airlock.

Then the ventilation system was installed and we waited for the night before initiating the transport to the launch pad, to avoid a too hot environment.

The PAC was then hoisted inside the Mobile Gantry up the to the mobile platform, quite an impressive handling!

At the end of the activities, the PAC was secured on its stand on the platform and the Mobile Gantry was closed. Everything was ready to proceed with the integration of the PAC on the launcher at D-4.